I'm not a massive fan of the Coaster brand as a whole but I don't mind this attempt so much.
It's taken me a while to click that they've taken a 20 min frequency double decker away from Low Fell and Harlow Green replaced it with a 30 min single decker (albeit the twirlys can now ride directly and in comfort to buy their fish and chips - saying that the X1 then Metro is quicker to the Coast)
Does anyone know why the GNE site says 24/24A timetable up to 24 Aug but Coaster doesn't start until Sept 1st
RE: Go North East