(07 Jun 2015, 7:26 pm)aureolin wrote If you're talking about Houghton cut, then that's one hell of a bank for any vehicle to climb. A bus load of passengers is never going to do anywhere near the speedlimit up there.
yeah i meant Houghton cut. I was joking with the vyking with a full load climbing it, though 5214 climbed a lot worse than other solars ive been on up Houghton cut
though I couldn't imagine a full load vyking up Houghton cut!