(25 Jun 2015, 7:15 pm)Jimmi wrote PR2 Howlands – Durham (Millburngate Bridge roadworks)
Route will terminate at New Elvet, omitting normal stops at Leazes Rd and Millburngate. Revised timetable details with departure times from Howland unchanged. Frequency remains every 10 minutes.
It'd have made more sense to run the PR2 between Howlands and Belmont, and then the PR1 Sniperley to Durham. That way neither service has to cross the Millburngate Bridge.