(29 Aug 2015, 2:43 pm)Cock Robin wrote They'll have 3 Max spares then!
Or are Stocton having two turns on X66/7?
(29 Aug 2015, 2:46 pm)Jimmi wrote Stockton are doing two turns on the X66/X67 I believe.
As it was stated here that two of those 3 Pulsars are being done, it points towards Stockton doing 2 X66/X67 workings. Sounds like they may have the last one off Darlington (which is said to be 2030-ish, same from Middlesbrough).