(10 Sep 2015, 7:03 pm)aureolin wrote The X12 timetable changes are a great example of that. It's heaving, which causes the delays, so what's the solution? Stop it serving a proportion of people that use it.
Unfortunately I disagree - the X12 needs to revert to limited stop. In my honest opinion, it needs a all stop service to operate alongside it. The temporary timetable over the summer showed that it can't have more time added into it without a wasteful layover in either Newcastle or Middlesbrough.