(15 Sep 2013, 5:30 pm)Michael wrote Wonder what option's people would of had if the 20/35 changes went ahead as GNE wanted them to.
Such as the 20 extending to South Shields - replacing the 35 - route would of taken 88 mins - PVR would of being 18 - if kept at every 10 mins.
35 - i think was run from Park lane to South Moosley etc only- remaining 10 mins - this could of being spilt.
It would have been interesting to say the least, considering the reliability of the Solars on the 20 as of late.
