(07 Oct 2015, 4:57 am)2bagstew wrote Have noticed that the 15 min frequently can be a bit of a laugh as 22/24 can there at the same time eg through Shotton Colliery.
The 24's route through Peterlee and onto Hartlepool seems to be the weak point. When it was the 22 that did that, it was the 22 that always got held up.