(27 Oct 2015, 9:55 pm)mb134 wrote Ah okay, will be interesting to compare the quality of the jobs
The Temsa's have been a long time in getting to this stage have they not?
Yeah I asked when I was up there the other week how much longer they reckoned and the answer was about a month. So based on that, they should be ready in a week or two.
They've been having to make modifications to the engine bays - the Redcar ones had all of these done previously - I believe they've been adding fire surpression systems etc (useful on Temsa's based on their track record!) and various other systems. Not to mention refurbishing the interior and finally giving them a full repaint.