(27 Nov 2015, 5:07 pm)Michael wrote High Handenhold Roadworks from 30 November 2015
Roadworks will commence on 30 November and last for around 16 weeks, in order for a roundabout at High Handenhold to be built.
Services 28, 28A diversion (northbound) from Newbridge Bank via Stone Row, anticlockwise loop via Edenfield, Green's Bank, A693, St Paul's Terrace, Stone Row to Grange Villa then via Newfield (28B route) to Pelton.
Southbound buses: Pelton, then via Newfield (28B route), Grange Villa, Stone Row, anticlockwise loop via Edenfield, Green's Bank, A693, St Paul's Terrace, Stone Row, Newbridge Bank.
Service 78A westbound from Pelton Lane, Grange Villa, Stone Row, St Paul's Terrace, and normal route. Eastbound diversion as westbound reversed.
A shuttle bus will be provided by DCC to cover the unserved sections or links.
Scholars Service 889 run from Ouston to Pelton, turning at Pelton Roseberry School Bus Park, before running back along West Pelton Front Street and on to Chester le Street North Lodge.
I saw the sign for ths the other week and was going to report it but i forgot to. Mind, it wont make it much easier for the buses, it is the junction just north that needs something doing to it (i know it wont have buses in mind).