(16 Oct 2013, 7:50 pm)JakeSavage wrote Think you'd best have a look at that on paper. You can't cut 15 minutes running/layover time out of the North Shields - Sunderland buses, so unless theyre increasing pvr to 8, they'll have to operate them as two seperate cycles 4 buses + 3 buses).
I worked out the PVR as 7 when I used current timings and worked out that if those were to be retained, the short and normal runs would not interwork.
I have since been told that it is possible to keep it as PVR 7 while interworking them - I've not looked at the timings I was given myself, but it sounded above board. Will have a look tomorrow though.