(18 May 2016, 8:01 pm)Tom wrote The old one (can't remember the number) used to go down the Quayside was which was way quicker as it was along the centrelink avoiding congestion in the city centre
Here's my proposal..
Service 1X North Sheilds - Metrocentre via Normal 1 route to Byker then after Byker Bridge takes a left turn down to the quayside and runs non-stop via the Centrelink to the Metrocentre.
Would serve more areas than a direct service I suppose. Frequency hourly on weekends and Fridays?