(01 Oct 2016, 9:57 pm)Driver9*** wrote Its a nightmare to keep on time even without external factors. By far the most hated route at Blyth depot, although the X8 is catching up in the shitness stakes.
Even without the roadworks, the 308 could do with all 10x vehicles being out with increased running and recovery time. The only problem being is that the 306 would need a PVR increase by 1x vehicle for this to happen too.
The 308 is probably the 2nd most well used / profitable service after the Angel (excl any Busways registered services) in the North East and it's easy to see why.