(05 Jan 2017, 8:54 pm)Kuyoyo wrote Not really - there's 2 spare on top of the PVR for the 30/31/36 and I believe it was mentioned at least one of the spares would be allocated to the 71 to cover the evening NEXUS contract requirement.
What is the NEXUS 71 requirement ? Is this why we have seen alot of 400MMC on the 71s before the 200s arrived ? Always had me baffled , Could see the 400s roam a bit more now the smaller MMC's are here.