(26 Feb 2017, 2:37 am)L469 YVK wrote I'd imagine that the 58 would get done at the same or similar time as the Cobalts due to the shared stops between Civic Centre and Battle Hill Drive.
Dan, do you think they will be done before the summer?
The 57/58 swapped!