(10 Mar 2017, 12:29 pm)RBZ 5459 wrote When changes were proposed SC were looking into splitting the 22 in the evening, meaning frequency between Wallsend and Silverlink could be reduced, which with the current setup would probably mean every 30 minutes. Wibble after the consultations is a little flackey so time will tell how that's panned out.
PVR down by one on the 18, revised 32/32A would see it go up by 2 or 3. The 1 I'd expect to lose one.
Ah right cheers, wouldn't surprise me.