(30 Mar 2017, 8:42 pm)Jamie M wrote They'll have the red engineer vans on the road before we know it with 706 being introduced!
Imagine one of them turning up with the number 6 spray painted onto the top panel...
Not much different to the DCC 216, in that case! I'm sure they've exceeded the 20 day grace period on some of their vehicles on that service by now.