It would still be possible to operate with PVR of 5 and have a decent layover
Currently X66 has 10mins layover & S1 has 2mins after full trip. I've knocked this together and would be possible to for X66 to have 10mins and S1 18mins layover with timing in between (based on current timetable)
RE: Go North East: Upcoming Service Changes v2