(20 May 2017, 5:25 am)Dan wrote Initially withdrawn having sustained defects uneconomical to repair, there may have been a change of plan subject to the availability of a part from a Trident recently withdrawn for scrap.
This is because there will be a large number of Park and Ride / shuttle services in operation again this summer - so any double-decks which can be retained, will be, for now.
Sent from my SM-G935F using Tapatalk
Wonder what the shuttles and park and rides could entail.
I know percy main do the port of tyne stuff for cruise ships (single decks) and the 327 services
Great north run most likely GNE
Wonder what else could be thrown into it