(08 Nov 2017, 7:46 am)Tom wrote Basically looks like the A1 is going to run onto the M1 instead of the 470/473. I don't see the problem in withdrawing those journeys on the A1 as I can't see many using them when there is no return bus. But I don't see the point in operating the M1 at all after those changes.
I would of thought be better if ran M1 so works onto 15