(07 Jan 2018, 2:53 pm)V514DFT wrote what i dont understand is why the 9 (soon to be 5) is still missing out East Howdon,wouldnt take that long to add in the whole of 4 stops (2 Jarrow/ S.Shields bound and 2 bound for North Shields),i would use the 2 bus stops that the 11 uses bound for Wallsend those could also serve the 5 for Jarrow and South Shields and the other 2 can serve the 5 for North Shields so all it has to do is come straight out of the Tunnel and in to East Howdon
That would add time towards Jarrow because it would have to drive back up to the new tunnel