(21 May 2018, 9:20 am)Michael wrote What services were these again?
These were the ones that were due to finish in July according to previous posts:
Service 37 (Weekday Peak Times)
1x low-floor Euro 4 bus with a minimum capacity of 36
Contract period: 23/07/2017 - 21/07/2018
Service 37/73 (Mon-Sat daytime)
3x low-floor Euro 4 buses with a minimum capacity of 49
Contract period: 23/07/2017 - 21/07/2018
Services 92, 83A, 927, 937, 68 and 93A (Mon-Sat daytime)
1x low-floor Euro 4 bus with a minimum capacity of 36
Maximum vehicle length 8.9m
Contract period: 23/07/2017 - 21/07/2018
Services 515/558 (Daily)
2x Euro 4 buses with a minimum capacity of 49
Contract period: 23/07/2017 - 21/07/2018
Service 643 (Mon-Sat daytime)
1x low-floor Euro 4 bus with a minimum capacity of 16
Maximum vehicle length 8.0m
Contract period: 23/07/2017 - 21/07/2018
Services R3/R4/R6 (Daily)
3x Euro 4 buses with a minimum capacity of 23
Maximum vehicle length 9.0m
Contract period: 23/07/2017 - 21/07/2018
But I'd imagine evening/sunday secured journeys would be included hence Stagecoach being awarded some, as I can't imagine them bidding for daytime services.