(27 Apr 2019, 10:05 pm)Adrian wrote Anything planned across the Transporter bridge, or is it closed for abseiling again?
H106 will be going over the Transporter this year - leaving the South Side at 12.35 and Middlesbrough at 12.44., returning to the Transporter at 13.20.