(20 Jun 2019, 10:42 pm)JM03 wroteThe number 1 avoids Holystone and West Allotment using the slip roads. This therefore losing passengers s it avoids it to save time. The 1 in this section needs re-routing and r-timing as it is a clear it wants to compete for the clearly profitable and favourable 51/A. As a local resident in this area, I prefer getting the 51/A as it is right on my doorstep yet the1 just avoids us and the metro loses out due to the 51 close proximity. The 1 will not be profitable in this area unless it serves these 2 villages, as they are losing out to the 51 as it stands.
Other ideas inc-
22- extended to Northumberland park to directly compete with 19.
62- extended to Cobalt
63- extended to Great Park
22 will require extra E400 drafted in from X63.
More E400MMCs ordered for extended 62/63 and to cover X63 too
Can’t see the 62/63 Extension working. Maybe the 22. One I could see extendable is the 38 to Quorum or Four Lane Ends.