(08 Mar 2020, 5:24 am)Stanleyone wrote Aren’t the peak runs done by deptford or Washington?, so this wouldn’t affect the pvr if that’s the case. Think the 8 can be done with 4 buses at the current timetable.
That's good, apart from the 18:12pm Hylton retail Park to Park Lane better not get withdrawn, means i would be walking to Southwick everytime i finish at 6.
8 PVR is 6
78 PVR is 7
Not sure how the 8 can be done with 4 buses? - either way i can't see the PVR dropping on each service, even if split.
---
How many of the Red Arrows have had the Euro 6 upgrade so far?, is this the last batch?