(20 Apr 2020, 12:33 am)Michael wrote Have any of the 21 electric Metrodecker EV double-deckers to arrived at York yet for the Park and Ride services?I know that at least 1 of them have been built and was doing driver training I believe. I’ll need to find the photo. They will be replacing around 9/15 Citaro artics with the rest remaining for the 2(?) as there’s a low bridge on the route. Could be also be replacing some Eclipses urbans (08 Regs).
What are they replacing?
RE: Yorkshire Bus Operations