You need to enable JavaScript to run this app.

Skip to main content

Temporary resurfacing works in Park Lane Interchange

Temporary resurfacing works in Park Lane Interchange

RE: Temporary resurfacing works in Park Lane Interchange
(05 Feb 2021, 6:06 pm)cbma06 wrote Needs knocking down , to far away from the shops, won’t be to long before it will be to far away from city hall when there close the civic centre.

there should of did the alternative option where there built Debenhams as buses coming in from green terrace and out on crow tree road and would of been incorporated into the bridges shopping centre, don’t know where else it could go , unless knock down the rest of the buildings on the college side of holmside and widen the road , which would give it a more central site for the bus station with bus stands on each side of the road.


Sent from my iPhone using Tapatalk

Problem was that Nexus and the Council wanted an interchange to integrate it into the Metro network. Only takes 2 or 3 minutes to walk down Park Lane, but people want to be close to the shops I get it, the old CBS location was always perfect, shame it gassed everyone with diesel fumes.

RE: Temporary resurfacing works in Park Lane Interchange