You need to enable JavaScript to run this app.

Skip to main content

Temporary resurfacing works in Park Lane Interchange

Temporary resurfacing works in Park Lane Interchange

RE: Temporary resurfacing works in Park Lane Interchange
(13 Feb 2021, 6:21 pm)Michael wrote Does anyone know which stands, the Arriva services 22/23 are stopping at when there side of Park Lane shuts?

I can't find out on the Arriva site... that's even if I'm looking in the right area

The GNE ones are stopping on Stockton Road, not sure if Arriva are doing the same.

RE: Temporary resurfacing works in Park Lane Interchange