You need to enable JavaScript to run this app.

Skip to main content

Temporary resurfacing works in Park Lane Interchange

Temporary resurfacing works in Park Lane Interchange

RE: Temporary resurfacing works in Park Lane Interchange
(05 Feb 2021, 3:35 pm)deanmachine wrote The 56 had to move stands due to the massive sink holes forming where it sits. Quite shocking really considering how recently those particular stands were resurfaced. The ABC side needs particular attention too.

Gateshead Interchange is not much better, spotted a massive sink hole at the top of the Newcastle bound drop off stand on Friday when passing through with a few others around the same area.

RE: Temporary resurfacing works in Park Lane Interchange