(28 Apr 2021, 10:07 pm)Storx wrote Don't see why they'd do that it's a Northumberland CC contract, they don't and won't care about residents in Fenham and will want the quickest way from Darras Hall and beyond which is via the A167(M) after giving their connection to Westerhope etc.
It's a small alteration, maybe two could do Fenham and two continue through Cowgate in each direction. Why is the connection to Westerhope so vital?
How long is the contract for?