(07 Jan 2014, 5:32 pm)Kuyoyo wrote As for PVR, X35/X36 will be interworking, PVR of 11 (Going on timetable, X35/X36 round trip will be 5hr 8mins including the 8 minutes turn-round off X35 onto X36 and the 5 minutes on X36 in Eldon Square). The short 9s will be 2.
the x35/x36 cant interwork if you look again the x36 departs sunderland 8 minuets before the x35 arrives in sunderland