(07 Jun 2021, 7:19 pm)Rapidsnap wrote Yeah that's a fair point, think it's around 12 for the Q1 / Q2 unless there's plans to reduce it to 20 minute frequency.
Think another idea is the 49/49A which takes 7 vehicles, so leaves 2 new ones spare plus 8809 making 3 spares, so perhaps used on the 33/33A contract
What would the PVR be for the Q1/2 with it terminating in Gateshead?
It would be very hard to stick a positive spin on a reduction in frequency along with the rumoured curtailment at Gateshead