(08 Jun 2021, 1:56 pm)Andreos1 wrote Aye, was genuinely surprised to see that the Q1/Q2 didn't bother crossing the river on a night, when I was in the town a few weeks back.They did fill the gap (sort of) with the 58A, although that was only towards Newcastle rather than towards Gateshead as well. I wonder if when eventually concerts resume and there's stuff on at the Sage whether a service will be reintroduced on an evening.
Or, there wasn't a service (like the 53/54) which was diverted down to the Quayside/Sage to fill the gaps.
The Q3 doesn't cover enough of the town and obviously doesn't touch the Gateshead Quays at all.
Imagine stopping at one of the many hotels on the Quayside and on getting off the train at Newcastle, finding you have to get a taxi down or walk (with bags)?
Sure that hill is getting steeper.
I blame global warming.
Sent from my moto g(8) power lite using Tapatalk