(27 Jul 2021, 2:17 pm)ASX_Terranova wrote Just a quick question, have GNE every had a 3 axle demonstrator?
I was thinking, maybe use a tri-axle single deckers on busy routes with low bridges, but the only ones that spring to mind that would be busy enough would be the 4 or the 8/8A/78/78A.
You would also have the X21 from The A1 and you could divert the X32 that way. Unless you think the X21 should go into Washington Galleries
The X21 shouldn't even go through Low Fell never mind the bloody Galleries. It already takes long enough as it is!