(24 Aug 2021, 12:51 pm)JP6004 wrote Bit of a tight squeeze with 5mins at each end. PVR might be 10 with 5mins at Whitley bay and 20 at gateshead. 9 already repainted into coasterIt's definitely a PVR of 9 the main part.
WBay: 10:33 (x3) | 11:33 (x3) | 12:33 (x3)
Ga'hd: 11:58
Ga'hd: 12:03
WBay: 13:27 then >>>>>> 13:33 ex WBay back to Gateshead