(07 Sep 2021, 9:57 pm)Keeiajs wrote They should, new connections from Parkside to Washington/Newcastle/Dalton Park/Middlesbrough/Hetton
Also I have seen the 62 6 times in the last 2 days on the Sunderland leg it has been packed.
Parkside only really works as a terminus point, there’s one road in, one road out. Parkside has 5 buses an hour, it really doesn’t need anything else. Connections to Dalton Park, Durham, Peterlee, Hetton, Houghton can all be made at the Town centre.