(21 Oct 2021, 1:29 pm)ASX_Terranova wrote Could the 21 or 50 be diverted on the old X22 route (i.e. through Newton Hall & Carr House Drive), would the demand be there.
I've wondered if there's a deliberate operational decision to slow down the 21 between certain points (say Durham - Chester) , spreading the load and encouraging people to use the X21 between the same points.