RE: Leamside Line
The funds could have been made available through the regional development fund under that auspices of ONE and South Tyneside Council. Railtrack did the work, the development money would have helped stations which would have safeguarded the line. As it was the work done to reopen the line was wasted, the signalling cable was stolen and track was lifted. The reports of the Leamside being closed since the 1960s are absolute rubbish, the line was still in use into the 90s and it was the embankment fire north of Tursdale which closed the line, today the entire embankment would have to be removed and replaced.