(16 Jan 2014, 4:51 pm)Michael wrote Mind it was, should be branded soon enough, although the timetable is still wrong for the 39 it has it down as Northern and running with Scania's
Edit, it looks like they might inter work at doxford park? - looking at the timetable
Coming in as the 29 and leaving as the 39, other way around, arriving as 39 leaving as the 29?
but don't see how that will work - not enough Scania's
Unsure why the 39's a generic timetable. I don't think they'll interwork. 39's arrive at 25, 45, 05 and then leave at 30, 50, 10.