You need to enable JavaScript to run this app.

Skip to main content

Repainting of the Prince Bishops

Repainting of the Prince Bishops

563891
RE: Repainting of the Prince Bishops
(21 Dec 2021, 10:47 pm)Thomas12 wrote I think the problem with the 5 and 26 interworking is that it would lead to operational inefficiencies.

The 5/9 interwork so driver changeovers can take place in Sunderland, and the 26/50 in Washington. If the 5/26 were to interwork it would lead to driver changeovers happening in Jarrow or South Shields, which would mean an additional cost.
They could work off the 20. And just change vehicles in South Shields.

Repainting of the Prince Bishops
RE: Repainting of the Prince Bishops
RE: Repainting of the Prince Bishops
RE: Repainting of the Prince Bishops
RE: Repainting of the Prince Bishops
RE: Repainting of the Prince Bishops
RE: Repainting of the Prince Bishops
RE: Repainting of the Prince Bishops
RE: Repainting of the Prince Bishops