(25 Dec 2021, 9:41 pm)KingSlayerRBLX wrote would be nice to see the X20 get Extended to South Shields again, so the citaros can spread some gold around the Gold Interchange. so it would be: Langley Park - Arnison Centre - Durham - Houghton - Sunderland - South Shields.
but really i would like to see more things in the South Shields area only because, you have the new interchange to show off more, regeneration plan is drawing in more people to the Town and Beach.
Speaking of the beach they should use the B7TL's from the Toon Tour once there done and rerun the Seafront Shuttle that Stagecoach did.
(26 Dec 2021, 1:06 pm)cbma06 wrote I would run the x20 between Durham and South Shields to maintain the through connection with the loss of the 20 in shields section, extend the 204/204A to Langley park, run the 20 between Durham and Sunderland only with double deckers on a 15 minute frequency, and either extend the 60 or 61 on a 15 minute frequency to South Shields.
Sent from my iPhone using Tapatalk
I would run the X20 to Jarrow (via the 9 route), so it doesn't fully duplicate the 20 with less stops and does a similar route but still different routes such as the 21/X21 The freq. is the same and it provides new links from Jarrow, South Tyneside and Boldon to Durham and Langley Park.
However I know this will have operational issues so unless the 5/26/50 can all interwork I don't know if this would be possible unless a new route is introduced probably not with the way GNE is from the Pandemic.