(19 Jan 2022, 4:09 pm)Dan wrote The contract has been offered to one single operator. The operator is entitled to sub-contract out, but the sub-contractor will need to have a vehicle of the same specification as required in the contract. The minimum was an 84-capacity Euro 5 bus (of which there aren't many in the North East).Wasn't it a PVR of 22 or 23?
RE: Metro Replacement 2022