RE: Could Norham Road Be closing in the long term?
Why would Percy Main depot not be able to accommodate electric buses. They’ll need works to connect the infrastructure to the national grid (which would no doubt take an age with all the red tape) wherever they were located. Many other older depots have had similar works done around the country.