(22 Jan 2022, 8:39 pm)Train8261 wrote Percy Main isn't big enough to have an area for the charging ports (if there the same as the Voltra)
(23 Jan 2022, 9:00 pm)Train8261 wrote A long shot but what about the current temporary depot at Howden for the metro. If they knock that down one the new one is built. Could it see Percy Main move there. Area is big enough for a depot and space for an area for charging ports
What are you basing these statements on? Do we know for sure? I'd suggest the supply and need for a substation is a problem that needs to be overcome, but at the same time we don't know whether there's already sufficient electricity capacity or different technology available at the existing Percy Main depot.
You can't just pluck a new depot out of fresh air. The costs for planning a new depot, building it, moving and selling old one aren't exactly insignificant. The new Consett depot cost a reported £3.5 million. There's already a hefty investment by Go North East in this project (£20 million, iirc!) without that added cost.
For me, the business case is clear in that it's going to be out of the existing facility at Percy Main.