(07 Mar 2022, 5:43 pm)Omega54 wrote GNE could try something new with the 55, taking it from Peterlee. Sherburn, Low Pittington, Houghton, Sunderland.
So with the X1 going back to old times, I wonder if the 20 will stay at every 15 mins.
Personally I would put the Sunderland - Durham at every 10 mins, with 3ph extending to South Shields.
The x20 could divert via Doxford to do the peak runs on the 55 if the 55 set to be withdrawn
I would of extended the 35 from low moorsley to sherburn via low and high pittington
I would chop the 20 at Sunderland and have the x20 going to shields, and chop the x20 at Durham and extend the 204/204a ( change number) to Langley park
Sent from my iPhone using Tapatalk