(07 Mar 2022, 5:55 pm)cbma06 wrote The x20 could divert via Doxford to do the peak runs on the 55 if the 55 set to be withdrawn
I would of extended the 35 from low moorsley to sherburn via low and high pittington
I would chop the 20 at Sunderland and have the x20 going to shields, and chop the x20 at Durham and extend the 204/204a ( change number) to Langley park
Sent from my iPhone using Tapatalk
Personally I'd get shot of the X20 altogether and clean up the corridor there and have the following routes.
20 - South Shields -> Sunderland -> Houghton Le Spring -> Dene Gardens -> Middle Rainton -> A690 -> Carrville -> Gilesgate -> Durham (Every 20 Mins)
20A - South Shields -> Sunderland -> Doxford Park -> Houghton Le Spring -> Rainton Arena -> Middle Rainton -> West Rainton -> Carrville -> A690 -> Durham (Every 20 Mins)
65 - Extended to Langley Park (Every 30 Mins)
35 - Evening route missing Rainton Arena (Every 30 Mins)
55 - Withdrawn (Nothing unique and alternatives exist with the X1, 62, 35 and 20/20A)
The PVR should be about the same and the 20/20A will be slightly quicker than it is now for most people with a better frequency on the South Shields ends (or you could drop it down to 20 minutes if it's not needed).