(12 Apr 2022, 4:32 pm)Jack Gill wrote I'm shocked the X30/1 aren't already half hourly, from what I've seen they rarely get busy. I don't think they really need decker's, however they are nice for the journey.Why would they increase the 6 (with a 6A) to everu 20 minutes when the whole point would be to reduce services?
As for the 6/6A thing I'm surprised that didn't happen either. The X72 doesn't seem the "express" type, and follows the 6 for a bit (I think?)
It probably wouldn't happen, but if it did then they could make it so the 6 was every 20 minutes instead of half hourly, so 2x 6 and 1x 6A per hour.
The existing 6 would be cut to hourly with the 6A running hourly to replace parts of the X72, allowing the X70/X71 to run every 30 minutes rather than 20/40 as now. In turn, that would then allow then to coordinate every 15 minutes at Sunniside with a reduced X30/X31 running every 30 minutes.
(12 Apr 2022, 4:19 pm)Unber43 wrote Maybe if there was a decrease in E400 PVR, they could put the X10 upto every 30 mins or maybe a new express route between Newcastle and Sunderland X56 possibly.X56 I doubt (unless some sort of link with Follingsby). X10 would need to be at bursting point to either consider re-increasing frequency in part or full, or re-introducing the X9.
47/47A would be the most likely candidates to displace older B9TLs.