(15 Apr 2022, 7:28 pm)Storx wrote It's only Euro 5 the 317 like.
The contract was Euro 5, but Stagecoach bid based on providing a Euro 6 bus.
Presumably the shorter Euro 6 E200s are needed for the 32 given the size restrictions on this route, hence resulting in the 317 being allocated these longer E300s.
Sent from my iPhone using Tapatalk