(17 May 2022, 5:44 pm)garym67 wrote The X30/31 have been really unreliable recently with many gaps in service, in addition to the planned non-runners due to driver shortages. It's too tightly scheduled on a very congested route into Newcastle which can easily take over 20 minutes to get from Dunston into Newcastle at busy times due to the ridiculous traffic flow over the Redheugh bridge, but that's another story! As soon as one bus gets a delay they pull the next one meaning big gaps in services. If it goes to 30 mins it needs to actually operate every time as you then have a very long wait for the next one if one is missing.sunniside has also be ridiculously bad, was stuck there for 20 mins a few times
Will the 78 be able to be a double decker if the route was re-routed back through Pelton