(08 Jun 2022, 10:07 pm)Storx wrote tbh. I wouldn't be surprised for both the 25 and 28 to be subsidised throughout taking in as much of the 23 and 29 in the process as they can.If the network doesn’t change much, but it’s heavily subsidised by the local authorities then GNE have won - same services but a lot more income for them.
(The 28 is already subsidised between Perkinsville and CLS so it's only the other half that needs money).
If 25, 28 remain much as they are now which depot will work them? Presumably Riverside as the CLS closure seems more about the building than the service cuts.