(09 Jun 2022, 3:17 pm)Unber43 wrote So basically this "consultation" was just....a waste of time
GNE.....im disappointed
They'll probably implement minor changes to the proposals based on passenger feedback. Can't see them altering their main plans apart from small route and timing changes in places.
A lot of the non-CLS changes probably help with the depot's closure. A lot of frequency (and subsequently PVR) cuts at surrounding depots that will make space for other vehicles and services to run from them.